Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/83301
Export to Endnote
Title: | Final report on area relinquished EL 27645 14 April 2010 to 13 April 2016 |
Title Holder / Company: | FAR Resources |
Report id: | CR2016-0339 |
Tenure: | EL27645 |
Year: | 2016 |
Author: | Jettner, WA |
Abstract: | EL 27645 forms part of FAR Resources Plenty Rivers Project which consists of 8 granted exploration licences covering 610km2 in the Harts Range/ Plenty River area of the Northern Territory, see figure 2. This licence covers part of the Jinka Domain, north of the Delny Fault Zone, the Kanandra Domain between the Delny Shear Zone and the Entire Point Fault Zone and part of the Harts Range Domain which is to the south of the Entire Point Fault Zone. This report is the Final Technical Report on that area relinquished on 13 April 2015. Work done consisted of a number of geological reconnaissance traverses through the surrendered areas with 25 rock samples analysed and 35 soil samples analysed using a Niton XRF. |
Date Added: | 21-Sep-2016 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL27645_2016_P.pdf | 2.46 MB | Add | |
EL27645_2016_P_01_SurfaceGeochem.txt | 1.12 kB | Text | Add |
EL27645_2016_P_02_SurfaceGeochem.TXT | 1.64 kB | Text | Add |
EL27645_METADATA.txt | 1.51 kB | Text | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.