Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/83230
Export to Endnote
Title: Partial relinquishment report for the period 22 April 2015 to 21 April 2016 EL 23565 Zamia Creek
Title Holder / Company: Rio Tinto Exploration
DPG Resources
Report id: CR2016-0309
Tenure: EL23565
Year: 2016
Author: Duncan, G
Abstract: EL 23565 was granted to Rio Tinto Exploration Pty Limited (RTX) on 22 April 2010 over an area of 38 blocks and up until the farm out to DPG Resources Australia Pty Limited (DPG) on 23 January 2014, no work was undertaken by RTX on the 19 blocks relinquished on 21 April 2016. Therefore this report documents work undertaken by DPG on EL 23565 over the area comprising the 19 blocks relinquished, for the period since they took over as operator from 23 January 2014 to 21 April 2016. David Jones commented on the prospectivity of the tenement in the 43-101 for GPM Metals Inc and subsequently Dr Mark Hinman has compiled a tectono stratigraphic framework for exploration for SEDEX deposits in the district including this tenement. Field work over the 19 blocks has not been completed to date but is planned over the remaining blocks within the 2016 to 2017 field season.
Date Added: 15-Aug-2016
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL23565_2016_P.pdf1.03 MBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader