Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/83134
Export to Endnote
Title: Aileron Project EL 24548 Yalyirimbi Annual report for period ending 1 December 2009
Title Holder / Company: NuPower Resources
Report id: CR2009-1122
Tenure: EL24548
Year: 2009
Author: Rafferty, W
Abstract: There was little on-ground exploration during the period. Drill Hole water sampling. Assay results of 15 bore and abandoned drill hole water samples and 47 NuPower drill hole water samples collected during Year 3 (2008) are reported here for the first time. A further 28 drill hole water samples were collected during the period and are reported here. Assay results are still awaited for these samples.
Date Added: 8-Aug-2016
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL24548_2009_A.pdf9.88 MBPDF Add
CR2009-1122_Appendix2_Water_Samples.zip125.74 kBZIP Add
CR2009-1122_Appendix3_Rehabilitation_Photos.zip81.19 MBZIP Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader