Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/83127
Export to Endnote
Title: Annual amalgamated technical report for period 18 September 2014 to 17 September 2015 GR311 Wiso Project
Title Holder / Company: Toro Energy
Report id: CR2015-0736
Tenure: EL27123;  EL27138;  EL29395
Year: 2015
Author: Shirtliff, G
Abstract: Exploration during the reporting period consisted of 23 holes for 2619.5m drilled by Areva across tenements EL 27138 and EL 27123. All holes failed to intersect mineralisation and all terminated within crystalline basement lithologies. Areva's recommendation at conclusion of drilling was that all targets had been tested no further work was warranted. Toro and Areva's JV agreement ended after drilling failed to produce favourable results. As such Toro surrendered EL 27138 at the end of its 6th year of tenure and will relinquish EL 27123 and EL 29395 at the end of their 4th year.
Date Added: 8-Aug-2016
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
GR311_2015_A_01.pdf3.13 MBPDF Add
GR311_2015_A_02_Appendix1.pdf8.42 MBPDF Add
CR2015-0736_Downhole.zip1.54 MBZIP Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader