Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/83112
Export to Endnote
Title: | EL 25207 Annual report for period ending 11 January 2011 |
Title Holder / Company: | Palace Resources Excalibur Mining |
Report id: | CR2011-0001 |
Tenure: | EL25207 |
Year: | 2011 |
Author: | Thomas, P |
Abstract: | In late June 2010 Excalibur commenced a RAB drilling program to test Uranium prospective geophysical targets over an early - mid proterozoic unconformity in the north west corner of EL 25207. Ten drill traverses were completed with 267 holes for 8758m. The program was completed in early August. Four meter composite drill chip samples were analysed on-site with an Innov-X Systems Delta series field portable XRF. Selected samples were also submitted to the laboratory. Geological chip logging, XRF and laboratory analysis revealed no evidence of significant mineralisation in the targeted areas. |
Date Added: | 2-Aug-2016 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL25207_2011_A_01.pdf | 755.31 kB | Add | |
EL25207_2011_A_02_Drillcollars.txt | 15.28 kB | Text | Add |
EL25207_2011_A_03_Lithologs.txt | 12.47 kB | Text | Add |
EL25207_2011_A_04_Lithocodes.txt | 1.74 kB | Text | Add |
EL25207_2011_A_05_DownholeGeochemXRF.txt | 904.85 kB | Text | Add |
EL25207_2011_A_06_DownholeGeochemLAB.txt | 124.51 kB | Text | Add |
EL25207_2011_A_07_SurfaceGeochemXRF.txt | 23.38 kB | Text | Add |
EL25207_2011_A_08_SurfaceGeochemLAB.txt | 2.47 kB | Text | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.