Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/82872
Export to Endnote
Title: EL 5891 King River Project Annual report for the period 13 May 2001 to 12 May 2002
Title Holder / Company: PNC Exploration Australia
Warrga Aboriginal Corporation
Cameco Australia
Report id: CR2002-0127
Tenure: EL5891
Year: 2002
Author: Melville, P
Sawyer, L
Rosewall, D
Beckitt, G
Abstract: The current years exploration program concentrated principally on further core drilling of the Aurari North mineralised zone. The drilling was directed at evaluating the ground to the east of the discovery holes where thick intervals of low grade uranium mineralisation were intersected in 2000. Airborne and ground geophysical surveys were focused on the Aurari North prospect environs and consisted of an airborne electromagnetic survey (TEMPEST), a detailed airborne magnetics, radiometric and DTM (Digital Terrain Model) survey and a ground-based gravity survey. Structural mapping along the western edge of the sandstone outliers, which borders the Aurari Fault Zone, was commenced.
NOTEAdditional geophysics datasets are available on request
Date Added: 30-May-2016
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL5891_2002_A.pdf435.88 kBPDF Add
readme.txt1.14 kBText Add
CR2002-0127_Appendicies.zip91.58 MBZIP Add
CR2002-0127_Data.zip2.16 MBZIP Add
CR2002-0127_Figures.zip20.86 MBZIP Add
CR2002-0127_Tables.zip12.07 kBZIP Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader