Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/82818
Export to Endnote
Title: | Final surrender report for EL 27240 Calvert Hills Project for the period 9 November 2009 to 11 November 2015 |
Title Holder / Company: | Redbank Operations Redbank Copper |
Report id: | CR2015-0840 |
Tenure: | EL27240 |
Year: | 2015 |
Author: | Armstrong, B |
Abstract: | During the term of the licence aeromagnetic data capture was undertaken during 2011 on a 100 m line spacing, and subsequent interpretation. Redbank Copper Limited was suspended from the ASX between the period 24 November 2011 and 10 May 2013, whilst the company was restructured and raised funds. Since relisting the company has commenced regional compilation work, but has not undertaken any on ground field exploration. |
NOTE: | See CR2011-0800 for Aerial Magnetic/Radiometric Survey |
Date Added: | 19-May-2016 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL27240_2015_S.pdf | 1.07 MB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.