Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/82804
Export to Endnote
Title: | EL 27337 Annual report for year ended 10 January 2012 |
Title Holder / Company: | Arafura Resources |
Report id: | CR2012-0038 |
Tenure: | EL27337 |
Year: | 2012 |
Author: | Green, M |
Abstract: | None of the field work outlined in the previous annual report was completed. Instead, it was decided to fly some detailed airborne geophysics over the entire tenement. A survey was completed between 4 and 12 December 2011 by Aeroquest Airborne. The survey was flown north-south at 100 m line spacing and a nominal sensor height of 30 m. A total of 2,929 line-km was collected. No further processing or interpretation has been completed on these data, yet. |
Date Added: | 15-May-2016 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL27337_2012_A.pdf | 36.8 MB | Add | |
EL27337_2012_A_02_Appendix1_Logistics_Report.pdf | 459.07 kB | Add | |
CR2012-0038_EL27337_2012_A_03_Appendix2_Airborne_Geophysics.zip | 40.12 MB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.