Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/82797
Export to Endnote
Title: Chilling Project Annual and final report for EL 25077 for the period 9 November 2006 to 8 November 2015
Title Holder / Company: Crossland Mines
Crossland Strategic Metals
Report id: CR2015-0802
Tenure: EL25077
Year: 2015
Author: Melville, P
Abstract: EL 25077 (Litchfield), Chilling Project, was granted to Crossland Mines Pty Ltd on 9 November 2006 for a period of 6 years. The Operator of the licence was Crossland Strategic Metals Ltd (Crossland). The licence was allowed to lapse on 8 November 2015. This report covers activities for the period 9 November 2006 to 8 November 2015. There has been no work carried out within the tenement in the previous 12 months. No field-based work has been carried out on the licence since 2009. A detailed desk-top compilation including research and planning involving the Eccles Uranium Prospect was commenced in 2010. The intention was to carry out a drilling programme in 2011 - 2012 once all the data had been compiled and optimum drill sites chosen. The AAPA Sacred Site survey commissioned by Crossland to cover the proposed drill areas took nearly 2 years to finalise. Crossland's new joint venture partner was not interested in continuing any exploration activities in the region; this resulted in the surrender of the company's remaining properties in the region.
NOTESee CR2008-0736 for Aerial Magnetic-Radiometric Survey
Date Added: 10-May-2016
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL25077_2015_AS.pdf1.03 MBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader