Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/81397
Export to Endnote
Title: EL 25307 Annual report for Lindemans Bore for the period 29 December 2010 to 28 December 2011
Title Holder / Company: Scriven, NH
Johnston, R
Proto Resources and Investments
Report id: CR2011-1171
Tenure: EL25307
Year: 2011
Author: Muir, M
Abstract: Work during the reporting period has included the interpretation of the ZTEM airborne survey, FLTEM ground geophysics survey and interpretation, commencement of drilling of diamond drill hole LBD 3 where 108m of diamond drilling was completed before drilling was postponed. Open University collaboration has been confirmed with the secondment of the volcanologist, Dr Mike Widdowson to head the projects and the construction of a database to help identify further targets in the Northern Territory. Work for the upcoming year should include the completion of LBD 3 (drilling, logging, sampling and interpretation). It should also allow for any planning of future holes if the results are positive.
Date Added: 22-Feb-2016
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL25307_2011_A_01.pdf2.44 MBPDF Add
EL25307_2011_A_02_Appendix1.pdf584.33 kBPDF Add
EL25307_2011_A_03_DrillCollar.txt1.65 kBText Add
CR2011-1171_EL25307_2011_A_04_appendix2_Geophysics.zip22.92 kBZIP Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader