Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/81283
Export to Endnote
Title: | Second partial relinquishment report for the period 12 September 2005 to 11 September 2015 |
Title Holder / Company: | Rio Tinto Exploration Groote Eylandt Mining Company |
Report id: | CR2015-0756 |
Tenure: | EL4171 |
Year: | 2015 |
Author: | Hartshorn, G |
Abstract: | Exploration activities conducted within the relinquished portion of EL 4171 have included: Reconnaissance inspections of outcrops and tracks within the area including rock sampling by RTX (4 in 2007, 20 in 2010 and 7 in 2012); Aircore drilling of bauxite targets (25 holes in 2007); Airborne geophysical survey (EM and magnetics in 2009); Reverse circulation drilling for manganese (18 holes in 2009); and Hand auger sampling for bauxite (8 auger holes in 2012). The exploration within the relinquished area did not locate any bauxite or manganese |
NOTE: | See CR2009-0798 for Aerial EM Survey |
Date Added: | 4-Feb-2016 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL4171_2015_P.pdf | 4.84 MB | Add | |
CR2015-0756_Appendix1.zip | 4.99 kB | ZIP | Add |
CR2015-0756_Appendix2.zip | 24.82 kB | ZIP | Add |
CR2015-0756_Appendix3.zip | 3.17 MB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.