Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/81150
Export to Endnote
Title: | Batchelor Project EL 9501 Annual report for period 13 September 2000 to 12 September 2001 |
Title Holder / Company: | Savanna Mineral Resources |
Report id: | CR2001-0286 |
Tenure: | EL9501 |
Year: | 2001 |
Author: | Robinson, SH |
Abstract: | This report covers work completed during the fifth year of tenure including extracting bulk sample from the trial pit and a small RAB drilling program. The two main aspects of this work were sinking a small pit to extract a 2000 tonne bulk sample and a minor RAB drilling programme. Some metallurgical tests were done. The Company has commissioned the preparation of an EIS but no report is yet available. The Company has also commenced the preparation of a Definitive Feasibility Study, the first stage of which has been completed. The full report is expected to be available in the first half of 2002. |
Date Added: | 20-Jan-2016 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
CR20010286.pdf | 6.49 MB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.