Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/81069
Export to Endnote
Title: Purni Coal Project Final report for the period 7 September 2011 to 9 October 2015 for EL 28472
Title Holder / Company: Merlin Coal
Report id: CR2015-0597
Tenure: EL28472
Year: 2015
Author: Schifano, J
Abstract: No exploration fieldwork was undertaken on EL 28472 during the tenure period from the 7 September 2011 till the 9 October 2015. EL 28472 was surrendered due to its small size of 7 blocks and area (12.25 km2) on the northwest margin in relation the size of the remaining PCP area (17,885.44 km2).
Date Added: 19-Jan-2016
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL28472_2015_S.pdf1.82 MBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader