Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/81059
Export to Endnote
Title: | Partial relinquishment report for EL 25080 Karinga Lakes Potash Brine Project |
Title Holder / Company: | Rum Jungle Resources |
Report id: | CR2015-0561 |
Tenure: | EL25080 |
Year: | 2015 |
Author: | Dunster, J |
Abstract: | EL 25080 is one of several substantially contiguous ELs in Rum Jungle Resources Ltd's Karinga Lakes Potash Project. Exploration targeted potassium- and magnesium- sulfate-salts in subsurface salt lake brine to produce potassium sulfate (SOP) and/or potassium magnesium sulfate (schoenite) fertiliser probably using solar evaporation ponds and flotation. The project has a JORC resource of potash brine and has advanced beyond exploration. A scoping study of the Karinga Lakes Project has been undertaken by CICCC and GHD. EL 25080 is one of the oldest titles in the project and contains a substantial portion of the resource. Twenty-one blocks are being voluntarily relinquished from EL 25080. There has been no on-ground work on the relinquished blocks and there is no expectation of potash brine being present in the areas relinquished. |
Date Added: | 18-Jan-2016 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL25080_2015_P.pdf | 1.03 MB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.