Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/81052
Export to Endnote
Title: Year 4 Partial surrender report for EL 28429 Marshall 24 August 2011 to 23 August 2015
Title Holder / Company: Bralich Holdings
Riding Resources
MMG Exploration
Report id: CR2015-0591
Tenure: EL28429
Year: 2015
Author: O'Farrell, D
Abstract: There has been no economic mineralisation found to date. A literature review of the area failed to shed any new potential on the tenement. However, recent ASTER and magnetic interpretations indicate some potential for repeat structures of the quartz vein at Bruce's prospect. On the 23 August 2015, 12 blocks were relinquished as required by the DME. The blocks were from the northern half of EL 28429 and deemed less prospective, based on structural and geochemical assessment.
NOTESee CR2014-0173 for Aerial Magnetic and Radiometric Survey Data
Date Added: 17-Jan-2016
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL28429_2015_P.pdf14.7 MBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader