Title: | Annual report on the Yimuyn Manjerr project area for the period 5 March 1999 to 4 March 2000 |
Title Holder / Company: | General Gold Operations |
Report id: | CR2000-0294 |
Tenure: | MLN1070; MLN1071; MLN1127 |
Year: | 2000 |
Author: | Burn, N |
Abstract: | This report summarises work during the reporting period. No drilling has occurred. Open pit mining at the Batman was carried out. The material mined was predominantly fresh with a minor element from the transition zone. Production during the reporting period was of 2,347,096 tonnes at 1.06 g-t Au (79,977 oz). Production in total was 21,440,538 tonnes at 1.05 g-t Au (723,252 oz). |
Date Added: | 19-Nov-2015 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
CR20000294.pdf | 1.69 MB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.