Title: Annual report on the Yimuyn Manjerr project area for the period 5 March 1999 to 4 March 2000
Title Holder / Company: General Gold Operations
Report id: CR2000-0294
Tenure: MLN1070;  MLN1071;  MLN1127
Year: 2000
Author: Burn, N
Abstract: This report summarises work during the reporting period. No drilling has occurred. Open pit mining at the Batman was carried out. The material mined was predominantly fresh with a minor element from the transition zone. Production during the reporting period was of 2,347,096 tonnes at 1.06 g-t Au (79,977 oz). Production in total was 21,440,538 tonnes at 1.05 g-t Au (723,252 oz).