Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/80677
Export to Endnote
Title: Annual report for MCCs 155-161 (SR 606-607), MLCs 24-34, 551, 552 and 699 (Orlando Mine), and MLCs 170-175 (Conductor) for the year ending 25 September 1999 Orlando Group
Title Holder / Company: Normandy Tennant Creek
Report id: CR1999-0440
Tenure: MCC155;  MCC156;  MCC157;  MCC158;  MCC159;  MCC160;  MCC161;  MLC24;  MLC25;  MLC26;  MLC27;  MLC28;  MLC29;  MLC30;  MLC31;  MLC33;  MLC34;  MLC551;  MLC552;  MLC699;  MLC170;  MLC171;  MLC172;  MLC173;  MLC174;  MLC175
Year: 1999
Author: Orton, V
Abstract: This report summarises work completed during the reporting period. Assay results from the last year drilling were analysed. The best results include 18m at 4.8 g/t Au from 171m including 6 m at 12.58 Au from 177m (ORRC-450). Three holes were drilled to test for repetitions of No 2 Lens mineralisation at depth below the western part of the pit. Two targeted the westward strike extension of ore zones mined in the Orlando pit. Assay results from the drilling indicate a low potential for repetition of No 2 Lens mineralisation at depth or along strike of the existing pit.
Date Added: 2-Oct-2015
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
CR19990440.pdf15.36 MBPDF Add
CR1999-0440_Data.zip14.53 kBZIP Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader