Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/80617
Export to Endnote
Title: | Annual report of the Yimuyn Manjerr project area for the period 5 March 1998 to 4 March 1999 |
Title Holder / Company: | General Gold Operations |
Report id: | CR1999-0262 |
Tenure: | MLN1070; MLN1071; MLN1127 |
Year: | 1999 |
Author: | Burn, N |
Abstract: | No mining or exploration took place during the year. The area and plant was under care and maintenance. 7598 ounces of gold was recovered from the heap leach pads. The sale of title, including the plant, was made to the Yimuyn Manjerr Joint Venture on 18 March 1999. The most recent reserve estimate is 94.51 million tonnes at 1.07 g-t Au. |
Date Added: | 22-Sep-2015 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
CR19990262.pdf | 6.54 MB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.