Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/80604Export to Endnote
| Title: | EL 8413 Running Creek 3 Fifth annual report for the year ending 28 December 1998 |
| Title Holder / Company: | Chemmet |
| Report id: | CR1999-0069 |
| Tenure: | EL8413 |
| Year: | 1998 |
| Abstract: | A preliminary feasibility study was completed. With the current low price of $7/lb and its foreseeable price at this level, it is concluded that a minimum of 10 million tonnes reserve at a contained 0.1% cobalt level is required. The current resource is +- 1 million tonnes. Additional metallurgical testing was carried out on leaching of material including flotation and chemical leading. In situ leaching is currently being assessed. |
| Date Added: | 22-Sep-2015 |
| Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
| File | Size | Format | Add to Download |
|---|---|---|---|
| CR19990069.pdf | 10.97 MB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.