Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/80412
Export to Endnote
Title: Annual report EL 24806 Ngalia regional project, period ending 15 April 2012
Title Holder / Company: Energy Metals
Report id: CR2012-0484
Tenure: EL24806
Year: 2012
Author: Taylor, W
Abstract: The final report of the CSIRO Joint Surveys Uranium Mineral Systems Project for the Ngalia Basin, of which EL 24806 is a part, was received during this period. The report was released to the public on 26 March 2012 (NTGS Record 2012-003). A modified plan for reconnaissance drilling (aircore/RC) and ground radiometric surveying was prepared during the period but has not yet been implemented due to priorities on other Bigrlyi tenements.
Date Added: 12-Aug-2015
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL24806_2012_A.pdf888.72 kBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader