Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/80359
Export to Endnote
Title: | Partial relinquishment report for period ending 19 March 2015 |
Title Holder / Company: | Minemakers Australia |
Report id: | CR2015-0247 |
Tenure: | EL29841 |
Year: | 2015 |
Author: | Pellatt, A Fulton, R |
Abstract: | The tenement was formed by the amalgamation of several tenements in early 2013. A total of 6 RC drill holes, a ground magnetics survey and an airborne electromagnetic survey were conducted on the pre-amalgamation tenements with no significant results. Since 19 March 2013 when EL 29841 was granted, no work has been completed. A partial relinquishment of what was deemed to be the least prospective part of the tenement was made in March 2015. |
Date Added: | 10-Aug-2015 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL29841_2015_P_01.pdf | 755.82 kB | Add | |
EL29841_2015_P_02_AirborneEM_Report.pdf | 2.86 MB | Add | |
EL29841_2015_P_03_GroundMag_Report.pdf | 1.65 MB | Add | |
EL29841_2015_P_04_DrillCollars.txt | 2.43 kB | Text | Add |
EL29841_2015_P_05_LithUnits.txt | 6.06 kB | Text | Add |
EL29841_2015_P_06_LithCodes.txt | 5.47 kB | Text | Add |
EL29841_2015_P_07_DownholeLith.txt | 8.85 kB | Text | Add |
EL29841_2015_P_08_Downhole_Surveys.txt | 1.78 kB | Text | Add |
EL29841_2015_P_09_Magsus.txt | 3.04 kB | Text | Add |
EL29841_2015_P_10_Radeye.txt | 2.72 kB | Text | Add |
EL29841_2015_P_11_WaterBoreConstruction.txt | 3.19 kB | Text | Add |
EL29841_2015_P_12_HydroNotes.txt | 2.4 kB | Text | Add |
EL29841_2015_P_15_Site_Audit_Report.pdf | 1.87 MB | Add | |
EL29841_2015_P_16_File_Verification.txt | 1.69 kB | Text | Add |
CR2015-0247_EL29841_2015_P_13_AirborneEM_data.zip | 1.63 MB | ZIP | Add |
CR2015-0247_EL29841_2015_P_14._GroundMag_data.zip | 1.72 MB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.