Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/80238
Export to Endnote
Title: EL 27662 Salt Hole Dam Annual and final report for the period 1 June 2010 to 7 April 2015
Title Holder / Company: Mithril Resources
Report id: CR2015-0202
Tenure: EL27662
Year: 2015
Author: McKinnon-Matthews, J
Abstract: Work completed over the life of the EL has included: Stream sediment sampling; Grab sampling; Geological mapping; and Airborne EM (VTEM). No field work was completed on the tenement and as a result of a review of the work completed the tenement was relinquished in full on the 7 April 2015.
NOTESee CR2011-0309 for VTEM Survey and Rock Chip Sampling
See CR2013-0573 for Stream Sediment and Grab Sampling
Date Added: 28-Jul-2015
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL27662_2015_AS.pdf1.59 MBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader