Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/80209
Export to Endnote
Title: EL 28501 Mount Lionel Annual Report for the period 16 August 2011 to 15 August 2012
Title Holder / Company: Mithril Resources
Report id: CR2012-0603
Tenure: EL28501
Year: 2012
Author: Lockheed, A
Abstract: During the reporting period, areas on the tenement were visited for geological assessment and verification however no surface sampling was undertaken. Further work was planned early in the reporting period but was delayed due to the extensive fires that spread through the region in September-November 2011. Regional stream sediment sampling is now planned in September-October 2012.
Date Added: 27-Jul-2015
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL28501_2012_A.pdf1.05 MBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader