Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/80209Export to Endnote
| Title: | EL 28501 Mount Lionel Annual Report for the period 16 August 2011 to 15 August 2012 |
| Title Holder / Company: | Mithril Resources |
| Report id: | CR2012-0603 |
| Tenure: | EL28501 |
| Year: | 2012 |
| Author: | Lockheed, A |
| Abstract: | During the reporting period, areas on the tenement were visited for geological assessment and verification however no surface sampling was undertaken. Further work was planned early in the reporting period but was delayed due to the extensive fires that spread through the region in September-November 2011. Regional stream sediment sampling is now planned in September-October 2012. |
| Date Added: | 27-Jul-2015 |
| Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
| File | Size | Format | Add to Download |
|---|---|---|---|
| EL28501_2012_A.pdf | 1.05 MB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.