Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/80182Export to Endnote
| Title: | Ascot Bore EL 27435 Annual technical report for the period 13 April 2011 to 12 April 2012 |
| Title Holder / Company: | Mithril Resources |
| Report id: | CR2012-0221 |
| Tenure: | EL27435 |
| Year: | 2012 |
| Author: | McKinnon-Matthews, J |
| Abstract: | No field work was conducted on the tenement during the reporting period. Extensive vegetation throughout the tenement area as a result from consistent rain in 2010-2011 posed a very high bushfire risk from August 2012 onwards. As a result of this a decision was made not to conduct any ground based exploration activities from this time onwards until the fuel load of the area was reduced significantly. |
| Date Added: | 22-Jul-2015 |
| Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
| File | Size | Format | Add to Download |
|---|---|---|---|
| EL27435_2012_A.pdf | 939.22 kB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.