Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/79766
Export to Endnote
Title: | BCF SC 05 Well Completion Report |
Title Holder / Company: | Imperial Oil & Gas |
Report id: | PR2014-0072 |
Tenure: | EP184 |
Year: | 2014 |
Corporate Author: | Imperial Oil and Gas |
Drillhole/Well Name: | BCF SC 05 |
Rig release date: | 16/07/2014 |
NOTE: | WCR_revised include the results of any relevant sample analysis that was not available at the time of the original WCR reports |
Document Type: | Well Completion Report |
Date Added: | 16-Mar-2015 |
Appears in Collections: | Petroleum Wells (PEX Wells) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
IOG_Geophysics_and_Drilling_Collaboration_Saint_Vidgeon_Project_Final.pdf | 6.11 MB | Add | |
PR20140072_DDRs.pdf | 91.45 kB | Add | |
WCR.pdf | 3.01 MB | Add | |
PR2014-0072_CoreChipPhotos.zip | 191.2 MB | ZIP | Add |
PR2014-0072_FieldLithologyLogs.zip | 7.68 MB | ZIP | Add |
PR2014-0072_WirelineLogs.zip | 4.99 MB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.