Please use this identifier to cite or link to this item:
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/79534
Title: | Weaber 2/2A Well Completion Report |
Title Holder / Company: | Santos Australia |
Report ID: | PR1988-0053 |
Tenure: | OP186 |
Year: | 1989 |
Corporate Author: | Santos Australia |
Drillhole/Well Name: | Weaber 2 |
Spud date: | 03/08/1988 |
Rig release date: | 14/08/1988 |
Bottom hole formation: | Tanmurra Formation |
Geological Province: | Bonaparte Basin |
Map250: | Auvergne SD5215 |
Map100: | Legune 4767 |
Subjects: | Composite logs Drill core Engineering - Drilling Engineering - Testing Geological interpretation Downhole surveys Interpreted log data Laboratory tests Mud logs Wireline logs |
NOTE: | The WCR for Weaber 2 and Weaber 2A is combined, as Weaber 2 was abandoned at 445m due to severe drilling problems. Weaber 2A was drilled 125m north of the original well. |
Document Type: | Well Completion Report |
Appears in Collections: | Petroleum Wells (PEX Wells) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
PR19880053.txt | 65 B | Text | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.