Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/79524Export to Endnote
| Title: | Well Completion Report Mt Winter 2A |
| Title Holder / Company: | Magellan Petroleum |
| Report id: | PR1986-0048 |
| Tenure: | OP178 |
| Year: | 1986 |
| Corporate Author: | Pancontinental Petroleum |
| Drillhole/Well Name: | Mount Winter 2A |
| Rig release date: | 18/08/1986 |
| NOTE: | Mount Winter 2 and Mount Winter 2A WCR is combined, as Mount Winter 2 was halted due to drilling difficulties. Mount Winter 2A was spudded after the rig was moved 10m. |
| Document Type: | Well Completion Report |
| Date Added: | 9-Jan-2015 |
| Appears in Collections: | Petroleum Wells (PEX Wells) |
Files in this Report:
| File | Size | Format | Add to Download |
|---|---|---|---|
| PR19860048_01_Contents.pdf | 29.75 kB | Add | |
| PR19860048_02_WellHistory.pdf | 24.17 kB | Add | |
| PR19860048_03_ReasonsforDrilling.pdf | 97.71 kB | Add | |
| PR19860048_04_OperationsReports.pdf | 1.2 MB | Add | |
| PR19860048_05_DrillingEquipmentandCharges.pdf | 60.6 kB | Add | |
| PR19860048_06_SiteAccessReconaissance.pdf | 66.17 kB | Add | |
| PR19860048_07_GeologicalDescriptionsMtWinterNo2Cuttings.pdf | 213.56 kB | Add | |
| PR19860048_08_CoreDescriptionsMtWinterNo2_2A_Pt1.pdf | 1.29 MB | Add | |
| PR19860048_08_CoreDescriptionsMtWinterNo2_2A_Pt2.pdf | 1.54 MB | Add | |
| PR19860048_09_CoreAnalysesReport.pdf | 174.99 kB | Add | |
| PR19860048_10_References.pdf | 18.79 kB | Add | |
| PR1986-0048_Logs.zip | 728.06 kB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.