Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/79497Export to Endnote
| Title: | Petroleum Engineering Status Report Dingo No. 2 Completion Prepared for Pancontinental Petroleum Limited Amadeus Joint Venture |
| Title Holder / Company: | Magellan Petroleum |
| Report id: | PR1985-0192 |
| Tenure: | OP175 |
| Year: | 1984 |
| Corporate Author: | S.A. Marschang and Associates |
| Drillhole/Well Name: | Dingo 2 |
| Rig release date: | 13/07/1984 |
| Document Type: | Engineering Report |
| Date Added: | 9-Jan-2015 |
| Appears in Collections: | Petroleum Wells (PEX Wells) |
Files in this Report:
| File | Size | Format | Add to Download |
|---|---|---|---|
| PR198501092_PetroleumEngineeringStatus.pdf | 7.22 MB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.