Please use this identifier to cite or link to this item:
                
Export to Endnote
		
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/79388Export to Endnote
| Title: | Johnstone West 1 Well Completion Report Basic Data EP 115 19th August - 20th September 2010 Northern Territory | 
| Title Holder / Company: | Central Petroleum | 
| Report id: | PR2011-0081 | 
| Tenure: | EP115 | 
| Year: | 2011 | 
| Corporate Author: | Central Petroleum | 
| Drillhole/Well Name: | Johnstone West 1 | 
| Rig release date: | 05/10/2010 | 
| NOTE: | Johnstone West 1 was sidetracked after a fish could not be recovered at 1475m. Johnstone West 1 ST1 was kicked off at 1415m, however Central Petroleum have only documented this report as Johnstone West 1. Digital wire line logs are now available (See Appendix 8). | 
| Document Type: | Well Completion Report | 
| Date Added: | 9-Jan-2015 | 
| Appears in Collections: | Petroleum Wells (PEX Wells) | 
Files in this Report:
| File | Size | Format | Add to  Download  | 
|---|---|---|---|
| PR20110081_WCR_Basic.pdf | 497.6 kB | Add | |
| PR2011-0081_Appendices.zip | 275.65 MB | ZIP | Add | 
| PR2011-0081_Enclosures.zip | 1.09 MB | ZIP | Add | 
Items in GEMIS are protected by copyright unless otherwise indicated.