Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/79158
Export to Endnote
Title: Partial relinquishment report for EL 23880 Barrow Creek Project from 10 October 2006 to 9 October 2014
Title Holder / Company: ABM Resources
Report id: CR2014-0827
Tenure: EL23880
Year: 2014
Author: Rohde, J
Abstract: ABM explored the tenement for the potential of gold mineralisation. Exploration included wide spaced systematic reconnaissance surface sampling (two soil samples), a helicopter borne gravity survey, reconnaissance RAB drilling along a track [one hole (NEWRRR0066) for 41m], regolith mapping, an aeromagnetic survey and the interpretation of the data into a regional geology map and a second project wide reprocessing of comprehensive aeromagnetic data and its integration into a compilation of a basement geology map.
NOTESee CR2007-0548 for Aerial Magnetic and Ground Gravity Surveys
Date Added: 29-Dec-2014
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL23880_2014_P_01.pdf.pdf294.79 kBPDF Add
EL23880_2014_P_02_SurfaceGeochem.txt.txt2.44 kBText Add
EL23880_2014_P_03_DrillCollars.txt.txt1.34 kBText Add
EL23880_2014_P_04_DHAssay.txt.txt1.94 kBText Add
EL23880_2014_P_05_DHSurvey.txt.txt1.1 kBText Add
EL23880_2014_P_06_Plate1.pdf13.59 MBPDF Add
EL23880_2014_P_07_Plate2.pdf3.08 MBPDF Add
EL23880_2014_P_08_Plate3.pdf5.88 MBPDF Add
EL23880_2014_P_09_Plate4.pdf16.14 MBPDF Add
EL23880_2014_P_10_Plate5.pdf9.12 MBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader