Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/79158
Export to Endnote
Title: | Partial relinquishment report for EL 23880 Barrow Creek Project from 10 October 2006 to 9 October 2014 |
Title Holder / Company: | ABM Resources |
Report id: | CR2014-0827 |
Tenure: | EL23880 |
Year: | 2014 |
Author: | Rohde, J |
Abstract: | ABM explored the tenement for the potential of gold mineralisation. Exploration included wide spaced systematic reconnaissance surface sampling (two soil samples), a helicopter borne gravity survey, reconnaissance RAB drilling along a track [one hole (NEWRRR0066) for 41m], regolith mapping, an aeromagnetic survey and the interpretation of the data into a regional geology map and a second project wide reprocessing of comprehensive aeromagnetic data and its integration into a compilation of a basement geology map. |
NOTE: | See CR2007-0548 for Aerial Magnetic and Ground Gravity Surveys |
Date Added: | 29-Dec-2014 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL23880_2014_P_01.pdf.pdf | 294.79 kB | Add | |
EL23880_2014_P_02_SurfaceGeochem.txt.txt | 2.44 kB | Text | Add |
EL23880_2014_P_03_DrillCollars.txt.txt | 1.34 kB | Text | Add |
EL23880_2014_P_04_DHAssay.txt.txt | 1.94 kB | Text | Add |
EL23880_2014_P_05_DHSurvey.txt.txt | 1.1 kB | Text | Add |
EL23880_2014_P_06_Plate1.pdf | 13.59 MB | Add | |
EL23880_2014_P_07_Plate2.pdf | 3.08 MB | Add | |
EL23880_2014_P_08_Plate3.pdf | 5.88 MB | Add | |
EL23880_2014_P_09_Plate4.pdf | 16.14 MB | Add | |
EL23880_2014_P_10_Plate5.pdf | 9.12 MB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.