Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/79147
Export to Endnote
Title: EL 25165 Swim Creek Project Annual report for the period 7 November 2008 to 6 November 2009
Title Holder / Company: Uranex
Rum Jungle Resources
Report id: CR2009-0826
Tenure: EL25165
Year: 2009
Author: Robinson, PF
Abstract: During Year 3, an AEM Survey was flown by Fugro Geophysics in association with Geoscience Australia (GA). After many delays, the initial survey data was received in May 2009. This was later processed and interpreted. Drill targets were chosen using these conductors, their potential host stratigraphy, proximity to surface uranium anomalies and accessibility. Drill follow up to test these litho-structural targets by Reverse Circulation drilling will be done at the peak of the next dry season in year 4 when access is to the flood plains is available.
Date Added: 29-Dec-2014
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL25165_2009_A.pdf2.25 MBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader