Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/79146
Export to Endnote
Title: | EL 25165 Swim Creek Project Annual report for the period 7 November 2007 to 6 November 2008 |
Title Holder / Company: | Uranex Rum Jungle Resources |
Report id: | CR2008-0666 |
Tenure: | EL25165 |
Year: | 2008 |
Author: | Robinson, PF |
Abstract: | Exploration activities during the period have involved both vehicle and helicopter assisted investigations of geology and the uranium radiometric anomalies located by the earlier year 1 airborne survey. It was also planned to conduct an airborne electromagnetic survey in conjunction with Geoscience Australia over the project in July. However the contractor Fugro Geophysical could not supply the aircraft and system and this is now postponed to the 2009 dry season. The results were to be used to locate litho-structural targets for drill follow up. |
Date Added: | 29-Dec-2014 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL25165_2008_A.pdf | 2.93 MB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.