Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/79079
Export to Endnote
Title: | Partial relinquishment report for EL 24987 Karinga Lakes Potash Brine Project |
Title Holder / Company: | Rum Jungle Resources |
Report id: | CR2014-0705 |
Tenure: | EL24987 |
Year: | 2014 |
Author: | Dunster, J |
Abstract: | EL 24987 is one of several substantially contiguous ELs in Rum Jungle Resources Ltd's Karinga Lakes Potash Project. Exploration is targeting potassium- and magnesium- sulfate-salts in subsurface salt lake brine to eventually produce potassium sulfate (SOP) and/or potassium magnesium sulfate (schoenite) fertiliser probably using solar evaporation ponds and flotation. The project has a JORC resource of potash brine. A scoping study of the Karinga Lakes Project is being undertaken by CICCC and GHD. The 24 eastern-most sub-blocks of EL 24987 have been voluntarily relinquished as part of renewal of the EL. This reduces the EL from 132 to 108 sub-blocks. There has been no on-ground work on the relinquished blocks. There is no evidence of potash brine being present in the area relinquished. |
Date Added: | 2-Dec-2014 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL24987_2014_P.pdf | 1.7 MB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.