Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/79018
Export to Endnote
Title: EL 28216 Chamber Bay East Final report for the period 21 October 2011 to 23 July 2014
Title Holder / Company: WDR Iron Ore
Report id: CR2014-0679
Tenure: EL28216
Year: 2014
Author: Bennett, A
Abstract: No work was carried out on the tenement during the first year due to the Company's major efforts during the period to develop its Roper Bar iron ore operation. During the second year of tenure WDR undertook a helicopter assisted reconnaissance field visit. Three rock chip samples were collected and analysed using XRF. Outcrop was observed to be poor, and in many cases poorly positioned with respect to the available geology maps. Silicified sandstone outcrops were observed in most instances and not sampled. Some goethitic and hematitic rubble was observed in one location with iron content up to 28.3 percent Fe. The provenance of these samples were uncertain, but there is a reasonable possibility that they represent laterite over a dolerite dyke. Further sampling is not considered warranted and WDR has elected to relinquishment the licence in full during the 3rd reporting period.
Date Added: 27-Nov-2014
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL28216_2014_S_01.pdf3.31 MBPDF Add
EL28216_2014_S_02_surfacegeochem.txt2.66 kBText Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader