Title: MLN 13 Report on geotechnical drilling at Czarina Pit
Title Holder / Company: Pine Creek Goldfields
Report id: CR1994-0615
Tenure: MLN13
Year: 1992
Author: Fawcett, CJ
Abstract: A total of 6 short HQ size diamond drill holes were drilled in Czarina pit during February 1992, in order to investigate the position and extent of the czarina Fault and associated faulting, jointing and shearing. This enabled pit wall stability to be interpreted for pit designs. Greywacke and siltstone of the Upper mine Greywacke Unit were intersected on the eastern limb of the Czarina Anticline. Assay results were generally in the order of 0.1 ppm to 2.0 ppm Au, however several higher intersections were made with values between 4.0ppm and 10.0 ppm Au.
Date Added: 16-Nov-2014
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
CR19940615.pdf1.32 MBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader