Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/78899
Export to Endnote
Title: | GR291 Amadeus Project Annual group report 3 May 2012 to 2 May 2013 |
Title Holder / Company: | Natural Resources Exploration |
Report id: | CR2013-0393 |
Tenure: | EL28303; EL28304; EL28305 |
Year: | 2013 |
Author: | Munro, N Forder, P |
Abstract: | In order to define the next phase of exploration, NRE's exploration program for the second term of its Amadeus Project consisted of extensive desktop studies and a historic review of previous exploration over the project area. NRE also engaged consultants to conduct a geological evaluation of the Amadeus Project in order to better delineate targets within the area. As a result of these activities during the second term, it was determined that given the style of mineralisation expected within this tenement, further field geological reconnaissance, field mapping, soil sampling, drainage sampling and rock chip sampling would assist in delineating future drill targets. However, NRE has encountered logistical issues of covering such a large and remote area with difficult ground conditions and hopes to conduct its field activities within the first quarter of the third term. |
Date Added: | 28-Oct-2014 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
GR291_2013_GA.pdf | 2.73 MB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.