Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/78744
Export to Endnote
Full metadata record
DC FieldValueLanguage
dc.contributor.authorCannard, Cen_US
dc.date.accessioned2014-10-20T11:55:50Z-
dc.date.issued1993en_US
dc.identifier.govdocCR1993-0778en_US
dc.identifier.urihttps://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/78744en_US
dc.description.abstractDuring the 1992-1993 year, 1,895,848 BCM of material was mined, while 1,435,318t of ore were treated in the CIP process. This produced 2,498 kg Au and 319.7 kg Ag at an average recovery of 78 percent. Exploration work involved percussion drilling at the Enterprise Mine Area. Percussion drilling at the Monarch Hill was to test the potential for oxide mineralisation over the extension of the Enterprise anticline. A small resource of 6,210t at 2.0 g-t Au of CIP ore and a possible 4,600t at 0.9 g-t Au heap leachable oxide ore. Drilling in the North Enterprise syncline and Eastern Fault Zone was to establish the main zones of interest. Results indicated the potential for a small low grade resource with an average grade of 1.20 g-t Au. The area directly south of the Enterprise Pit was tested for potential shallow oxide mineralisation. A small resource of 9,200t of CIP ore at 2.0 g-t Au was delineated. ore grades were up to 18.70 g-t Au. Percussion drilling immediately north of the North Czarina Pit tested for possible near-surface extensions of North czarina mineralisation. Results were disappointing, delineating only a thin, patchy, sub-economic cover of laterite - colluvium.en_US
dc.subject.classificationPrecious metalsen_US
dc.subject.classificationGolden_US
dc.subject.classificationGold depositsen_US
dc.subject.classificationMiningen_US
dc.subject.classificationBlastingen_US
dc.subject.classificationMine productionen_US
dc.subject.classificationMine rehabilitationen_US
dc.subject.classificationMine wastesen_US
dc.subject.classificationAcid mine watersen_US
dc.subject.classificationDrillingen_US
dc.subject.classificationPercussion drillingen_US
dc.subject.classificationVeinsen_US
dc.subject.classificationFault zoneen_US
dc.subject.classificationAnticlinesen_US
dc.titleMLN 13 Annual report 1 July 1992 to 30 June 1993en_US
dc.relation.isatmap100Pine Creek 5270en_US
dc.relation.isatmap250Pine Creek SD5208en_US
dc.relation.isatgeolprovincePine Creek Orogenen_US
dc.description.stratnameMount Bonnie Formationen_US
dc.description.stratnameBurrell Creek Formationen_US
dc.description.drilling53 Percussion holes for 530 m - North Enterpriseen_US
dc.description.drilling170 Percussion holes for 850 m - North Czarinaen_US
dc.description.drilling2,042 m of percussion drilling - Monarch Hillen_US
dc.description.drilling2,398 m of percussion drilling - South Enterpriseen_US
dc.description.mineprospectnameEnterpriseen_US
dc.description.mineprospectnameCzarinaen_US
dc.description.mineprospectnameMonarch Hillen_US
dc.identifier.tenureMLN13en_US
dc.description.modifyhistory02/10/2003en_US
dc.description.modifyhistory29/07/2005en_US
dc.description.modifyhistory18/08/2014en_US
dc.description.modifyhistory29/09/2014en_US
dc.description.modifyhistory30/09/2014en_US
dc.description.modifyhistory21/03/2016en_US
dc.contributor.holderPine Creek Goldfieldsen_US
dc.identifier.collectionnameMinerals Exploration Reports (MEX)en_US
dc.identifier.govdocprefixCR1993en_US
local.flag.notified1
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
MLN13_1993_A.pdf1.47 MBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader