Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/78721
Export to Endnote
Title: | Summary of drilling at North Enterprise MLN 13 February to June 1992 |
Title Holder / Company: | Pine Creek Goldfields |
Report id: | CR1992-0826 |
Tenure: | MLN13 |
Year: | 1992 |
Author: | Fawcett, C |
Abstract: | Eleven inclined and vertical RC holes were drilled to the north of the Enterprise pit for a total of 680m. These holes were designed to test the area between the Enterprise Anticline and the Czarina Anticline across the Eastern Fault Zone and the Enterprise syncline. Mineralisation across the syncline and in particular between the syncline and czarina Anticline was of low grade but continuous and well structured, indicating some potential for oxide material in the area. |
Date Added: | 20-Oct-2014 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
CR19920826.pdf | 1.16 MB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.