Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/78641Export to Endnote
| Title: | EL 29205 Napperby Uranium Project Partial surrender report 4 July 2012 to 3 July 2014 |
| Title Holder / Company: | Wuhua Mining Corporation |
| Report id: | CR2014-0511 |
| Tenure: | EL29205 |
| Year: | 2014 |
| Author: | Meng, X |
| Abstract: | Exploration during the reporting period comprised a ground reconnaissance trip to locate and sample the surface geology and nearby known mineral occurrences, ASTER nigh-time thermal data processing and interpretation and the desktop study for the uranium exploration. Based on this study, at the end of the second year of term EL 29205 underwent a compulsory 50 percent reduction, and reduced to 7 blocks effective 4 July 2014. Work undertaken across the relinquished portions of the tenement includes: Review of open file exploration data; Reconnaissance field trips; and ASTER Night Time Thermal Infrared (NTTI) data interpretation. |
| Date Added: | 9-Oct-2014 |
| Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
| File | Size | Format | Add to Download |
|---|---|---|---|
| EL29205_2014_P.pdf | 6.48 MB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.