Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/78641
Export to Endnote
Title: EL 29205 Napperby Uranium Project Partial surrender report 4 July 2012 to 3 July 2014
Title Holder / Company: Wuhua Mining Corporation
Report id: CR2014-0511
Tenure: EL29205
Year: 2014
Author: Meng, X
Abstract: Exploration during the reporting period comprised a ground reconnaissance trip to locate and sample the surface geology and nearby known mineral occurrences, ASTER nigh-time thermal data processing and interpretation and the desktop study for the uranium exploration. Based on this study, at the end of the second year of term EL 29205 underwent a compulsory 50 percent reduction, and reduced to 7 blocks effective 4 July 2014. Work undertaken across the relinquished portions of the tenement includes: Review of open file exploration data; Reconnaissance field trips; and ASTER Night Time Thermal Infrared (NTTI) data interpretation.
Date Added: 9-Oct-2014
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL29205_2014_P.pdf6.48 MBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader