Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/78613
Export to Endnote
Title: Partial Relinquishment Report on EL 24549 Allamber Project 23 September 2005 to 22 September 2013
Title Holder / Company: Element 92
Thundelarra Exploration
Report id: CR2013-1098
Tenure: EL24549
Year: 2014
Author: Bajwah, ZU
Abstract: During the period under review, the relinquished part of the project area was explored by a desktop study and geological modelling. In addition a number of field visits were undertaken for ground truthing. No geochemical sampling, drilling or geophysical survey was undertaken on the surrendered blocks during its tenure. Geological, petrological and ground truthing of the project area indicated that granites in the southern part of the EL 24549 are devoid of any significant mineralisation.
Date Added: 7-Oct-2014
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL24549_2013_P.pdf850.73 kBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader