Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/78613
Export to Endnote
Title: | Partial Relinquishment Report on EL 24549 Allamber Project 23 September 2005 to 22 September 2013 |
Title Holder / Company: | Element 92 Thundelarra Exploration |
Report id: | CR2013-1098 |
Tenure: | EL24549 |
Year: | 2014 |
Author: | Bajwah, ZU |
Abstract: | During the period under review, the relinquished part of the project area was explored by a desktop study and geological modelling. In addition a number of field visits were undertaken for ground truthing. No geochemical sampling, drilling or geophysical survey was undertaken on the surrendered blocks during its tenure. Geological, petrological and ground truthing of the project area indicated that granites in the southern part of the EL 24549 are devoid of any significant mineralisation. |
Date Added: | 7-Oct-2014 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL24549_2013_P.pdf | 850.73 kB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.