Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/78602
Export to Endnote
Title: | EL 28369 Brumby Dam Year 1 Annual report for the period 4 July 2011 to 3 July 2012 |
Title Holder / Company: | Mithril Resources |
Report id: | CR2012-0507 |
Tenure: | EL28369 |
Year: | 2012 |
Author: | Lockheed, A |
Abstract: | Mithril first applied for the ground with a view to explore for Nickel sulphide deposits whilst remaining open minded to opportunities provided by other commodities. Work completed during the reporting period included: Historical data compilation; 15 rock chip samples collected; and VTEM Survey - 59 line kilometres of data was collected. Work completed during the reporting period has identified a number of VTEM anomalies requiring ground follow-up. These will be the focus of further work during the next reporting year. |
Date Added: | 6-Oct-2014 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
EL28369_2012_A_01.pdf | 1.12 MB | Add | |
EL28369_2012_A_02_SurfaceLocations.txt | 12.25 kB | Text | Add |
EL28369_2012_A_03_SurfaceGeochem.txt | 14.05 kB | Text | Add |
EL28369_2012_A_04_LithologyCodes.txt | 2.28 kB | Text | Add |
EL28369_2012_A_05_VTEMReport.pdf | 4.83 MB | Add | |
EL28369_2012_A_05_VTEMReport.pdf.jpg | 307.02 kB | JPEG | Add |
EL28369_2012_A_07_FileListing.txt | 3.71 kB | Text | Add |
CR2012-0507_Geophysics.zip | 60.29 MB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.