Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/78520
Export to Endnote
Title: ERL 88 Mount Shoobridge Project Annual report for period 19 September 1990 to 18 September 1991
Title Holder / Company: Biddlecombe, RM
Dominion Gold Operations
Report id: CR1992-0067
Tenure: ERL88
Year: 1992
Author: Vooys, RA
Burn, NR
Abstract: Gold mineralisation at Mount Shoobridge is hosted in a series of quartz vein stockwork zones contained hosted by Mount Bonnie Formation sediments, within the anticlinal Mount Shoobridge structure. These stockwork zones are discontinuous along a 2.2km strike zone bearing mineralisation. Unlike previous exploration companies, Dominion perceives the Mount Shoobridge property to have the potential to host small, low to moderate grade ore bodies which could be economically mined from shallow open pits and trucked to the Cosmo Mine operation. During the second year of tenure, Dominion has set about re-evaluating all previous exploration data (including drill hole logs costean and geochemical data) and developing an enhanced data base from which a drill programme can be planned for resource evaluation. work also included grid resurrection, detailed mapping and rock chip sampling. Details of the rock chip sampling are not included in this report.
Date Added: 10-Sep-2014
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
CR19920067.pdf6.31 MBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader