Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/78408
Export to Endnote
Title: EL 26848 Walabanba Project Partial relinquishment report 4 March 2009 to 3 March 2014
Title Holder / Company: Toro Energy
Report id: CR2014-0276
Tenure: EL26848
Year: 2014
Author: Wetherley, C
Abstract: Since the licence was granted a TEMPEST survey has been carried out, surface sampling and aircore drilling has also been undertaken. Three rock samples and seven drillholes fall within the relinquished area. A groundwater study has been completed from the holes drilled. A voluntary partial relinquishment from 185 down to 92 blocks has been undertaken prior to the fifth anniversary of grant of the licence, and all areas of interest have been retained for further work.
Date Added: 17-Aug-2014
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
EL26848_2014_P_01.pdf1.38 MBPDF Add
EL26848_2014_P_02_DHLocations.txt2.3 kBText Add
EL26848_2014_P_03_DHLithology.txt80.88 kBText Add
EL26848_2014_P_04_DHAssay.txt13.9 kBText Add
EL26848_2014_P_05_SampLoc.txt1.82 kBText Add
EL26848_2014_P_06_SampAssay.txt4.72 kBText Add
EL26848_2014_P_07_LithologyCode.pdf27.38 kBPDF Add
EL26848_2014_P_08_File_Verification_List.txt1.24 kBText Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader