Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/78335
Export to Endnote
Title: EL 27472 and EL 27473 Larrimah East Project Annual report for the period 18 February 2011 to 17 February 2012
Title Holder / Company: WDR Gold
Report id: CR2012-0133
Tenure: EL27472;  EL27473
Year: 2012
Author: Bennett, AP
Abstract: During the second year of tenure, WDR commissioned a consultant to reprocess and interpret results of the EM survey flown in the first year. The interpretation has highlighted two 'priority 1' conductors and thirteen 'priority 2' conductors. Drill holes were planned to test the priority 1 conductors and the intention is to drill these holes during the next year.
Date Added: 26-Jun-2014
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
GR207_2012_A_01.pdf1.1 MBPDF Add
GR207_2012_A_02_EMInterpReport.pdf2.37 MBPDF Add
GR207_2012_A_03_CDIDepthSlices.pdf18.25 MBPDF Add
GR207_2012_A_04_FileVerificationListing.txt210 BText Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader