Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/78335
Export to Endnote
Title: | EL 27472 and EL 27473 Larrimah East Project Annual report for the period 18 February 2011 to 17 February 2012 |
Title Holder / Company: | WDR Gold |
Report id: | CR2012-0133 |
Tenure: | EL27472; EL27473 |
Year: | 2012 |
Author: | Bennett, AP |
Abstract: | During the second year of tenure, WDR commissioned a consultant to reprocess and interpret results of the EM survey flown in the first year. The interpretation has highlighted two 'priority 1' conductors and thirteen 'priority 2' conductors. Drill holes were planned to test the priority 1 conductors and the intention is to drill these holes during the next year. |
Date Added: | 26-Jun-2014 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
GR207_2012_A_01.pdf | 1.1 MB | Add | |
GR207_2012_A_02_EMInterpReport.pdf | 2.37 MB | Add | |
GR207_2012_A_03_CDIDepthSlices.pdf | 18.25 MB | Add | |
GR207_2012_A_04_FileVerificationListing.txt | 210 B | Text | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.