Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/78333
Export to Endnote
Title: | GR207 Larrimah East Project Annual report for the period 18 February 2012 to 17 February 2013 |
Title Holder / Company: | WDR Gold |
Report id: | CR2013-0234 |
Tenure: | EL27472; EL27473 |
Year: | 2013 |
Author: | Gaughan, C |
Abstract: | During the current reporting period two diamond drillholes were drilled over 'priority 1' EM targets in EL 27472. Drilling commenced on 16 September and finished on the 8 October 2012. Processing of the core was completed in early November. A commercial contractor carried out wireline logging of gamma, magnetic susceptibility, density, conduction, resistivity and deviation. A mafic volcanic-dolerite was composite-bulk sampled for chemical assay, as were selected features such as minor chlorite-quartz + or - pyrite veins. There was no significant mineralisation encountered during the drilling and the source of the Airborne EM anomalies have not been explained. |
Date Added: | 26-Jun-2014 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
GR207_2013_GA_01.pdf | 3.82 MB | Add | |
CR2013-0234_Data.zip | 3.58 MB | ZIP | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.