Please use this identifier to cite or link to this item:
Export to Endnote
https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/78298
Export to Endnote
Title: | Mount Tymn Group of MCN's Final Report |
Title Holder / Company: | Billiton Australia |
Report id: | CR1990-0718 |
Tenure: | MCN3026; MCN3029; MCN3030; MCN3032; MCN3033; MCN3035; MCN3036; MCN3038; MCN3039 |
Year: | 1990 |
Author: | Marsh, S |
Abstract: | This reports concerns the package of MCNs known as Mount Tymn that is being explored by BHP Billiton under JV to the leaseholder, Mr Hamilton. The most prospective central potion of the area area was geologically mapped. A ground magnetic study was carried out and the low tenor anomalies tested by drilling. Twelve 100 m deep RC holes were drilled on geophysical targets, geochemical anomalies or sited with respect to old workings. All intercepts were low, most being at or below 0.01 ppm Au. MTRC 007 was the best drillhole with 7m downhole at 25 g/t, but the true width is probably half this. Results were considered disappointing and BHP withdrew form the JV. |
Date Added: | 25-Jun-2014 |
Appears in Collections: | Minerals Exploration Reports (MEX) |
Files in this Report:
File | Size | Format | Add to Download |
---|---|---|---|
CR19900718.pdf | 872.04 kB | Add |
Items in GEMIS are protected by copyright unless otherwise indicated.