Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/78259
Export to Endnote
Title: EL 4868 Fourth annual report 29 May 1989 to 28 May 1990
Title Holder / Company: Purich, P
N Byrne and Associates
Report id: CR1990-0494
Tenure: EL4868
Year: 1990
Author: Byrne, N
Abstract: Only geochemical results appended. The report described what was done but no results included. This included rock chip sampling, drilling, petrology, EM surveys and gridding. The aim of the project is to reopen the Sundance extended mine.
Date Added: 24-Jun-2014
Appears in Collections:Minerals Exploration Reports (MEX)

Files in this Report:
File SizeFormat Add to
Download
CR19900494.pdf2.15 MBPDF Add


Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader