Please use this identifier to cite or link to this item: https://geoscience.nt.gov.au/gemis/ntgsjspui/handle/1/78136
Export to Endnote
Title: Annual report EL 27426 Benmara Project
Title Holder / Company: Universal Splendour Investments
Report id: CR2011-1167
Tenure: EL27426
Year: 2012
Abstract: Exploration until November 2011 has consisted of geophysical data analysis, gravity survey and interpretation, numerical modelling with PredictoreTM, target selection and reverse circulation drilling and assay. A total of 5 holes were drilled for 323 m and 10 samples consisting of 5 metre composite RC chips were assayed. All drilled samples were measured for radioactivity. No anomalous mineralisation was detected in any of the drilling.
Date Added: 19-Jun-2014
Appears in Collections:Minerals Exploration Reports (MEX)



Items in GEMIS are protected by copyright unless otherwise indicated.

Get Adobe Reader